Postuler

Publié il y a 6 mois

Construction Scheduler

@ March Consulting LP

Saskatoon, Saskatchewan

Contrat5+ ans d’expérience
Postuler
SIGNAUX

En bref

March Consulting LP is hiring a full-time Construction Scheduler in Saskatoon, Regina, or Calgary, reporting to the Manager of Project Services. The role leads multidisciplinary teams to deliver construction projects safely, on schedule and within budget, and maintains detailed execution plans. The posting states 40 hours per week, Monday to Friday, with benefits including life, disability, health and dental insurance, RRSP and a health spending account.

Responsabilités :

  • Développer et maintenir les plans d'exécution de construction
  • Suivre la performance des projets et les écarts
  • Coordonner entrepreneurs, fournisseurs et équipes client
  • Gérer les risques et les changements de portée, d'échéancier et de coûts
  • Promouvoir les pratiques de travail sécuritaires

Résumé des exigences :

  • Baccalauréat en génie ou diplôme en technologie de l'ingénierie
  • Minimum 5 ans d'expérience en gestion de projet ou construction
  • Maîtrise des logiciels de gestion de projet
  • Habiletés de communication et de résolution de conflits

Outils et compétences

Avantages mentionnés

Assurance maladieSoins dentairesAssurance vieRégime de retraiteCongés payésCompte santé
Source et dates

Type de source non vérifié · humi

Date publiée par l’employeur
2026-05-08
Première détection par notre source
2026-10-27
Mise à jour du dossier source
2026-10-27

Ces dates décrivent le dossier source, pas une vérification en direct du recrutement. Consultez l’offre originale.

Détails du poste

NiveauIntermédiaire
DomaineGénie
Expérience5 an(s) et plus
Heures par semaine40
Horairejour
Milieu de travailBureau, Chez les clients, Chantier
PositionAssis et debout
Exigences physiquesphysique faible · ordinateur élevé
LanguesEnglish
Permis et certificationsP.Eng., PMP, Red Seal
Candidatures encouragéesAutochtones
FormationBaccalauréat (exigé), Collégial (DEC) (exigé)
Domaines d’étudesEngineering, Engineering technology
Avantages mentionnésRégime de retraite

Résumé et détails rédigés par l’IA à partir de l’offre; l’offre de l’employeur fait foi.

March Consulting LP

ChampValeur
Offres sur Jobsy20
Description

Introduction

We are looking for a full-time Construction Scheduler to join either our Saskatoon, Regina, or Calgary team! This position will report to the Manager of Project Services. We have multiple opportunities across Canada. Indigenous applicants are encouraged to apply.

Company

March Consulting LP (“March”) is an Indigenous-owned and employee-owned, multi-disciplinary engineering company headquartered in Saskatoon, Saskatchewan. We maintain the values that we began with and made a name for ourselves by our dedication to the development and success of our clients. î-nitawîthimihcik nîhithaw athisitiniwak kâ-kî-kîsîhtâcik sâpo-ayamihcikîwin (qualified Indigenous professionals are encouraged to apply). Tiniki

March takes pride in providing a family-like culture that supports our client’s needs and well-being of our employees. We hire the right employees for the long-term, where they can come learn and grow their career with the company. We welcome those who have a strong sense of integrity and a passion for the province we live and work in.

March provides engineering, procurement, project, and construction management services to a variety of resource-based industrial and commercial enterprises. In addition, March and its employees have developed specialized expertise in feasibility studies and asset integrity in the heavy industrial sector.

Position Overview

Primary Responsibilities

  • Lead and coordinate multidisciplinary teams to deliver construction projects safely, on schedule, and within approved budgets.
  • Define project objectives, scope, and success criteria in collaboration with internal teams and client stakeholders.
  • Develop, baseline, and maintain detailed construction execution plans, integrating project controls, scheduling, and resource intelligence.
  • Communicate project requirements clearly to all team members, ensuring alignment on scope, schedule, quality, and deliverables.
  • Manage project resources in a matrix environment, working closely with functional managers to optimize staffing and technical support.
  • Coordinate internal teams, contractors, vendors, and third‑party service providers to ensure cohesive project execution.
  • Oversee contractor performance, QA/QC activities, supplier coordination, site logistics, and interface management with client personnel.
  • Monitor project performance using project management tools, metrics, and data analytics to track progress and identify variances.
  • Continuously evaluate project plans, schedules, and budgets, recommending adjustments to maintain alignment with project objectives.
  • Conduct risk identification, assessment, and mitigation planning; escalate risks to the Project Sponsor or Project Manager as required.
  • Manage and document changes to scope, schedule, and cost in accordance with project governance and change‑control processes.
  • Maintain comprehensive project documentation, ensuring accuracy, traceability, and compliance with March’s project execution standards.
  • Build and sustain strong relationships with March’s project teams, clients, contractors, and other stakeholders.
  • Contribute to the enhancement of project execution frameworks, tools, and processes, leveraging lessons learned and project intelligence.
  • Promote and enforce safe work practices, ensuring compliance with all applicable safety programs, procedures, and regulatory requirements.
  • Conduct site visits to monitor construction progress, validate field conditions, and support issue resolution.
  • Perform additional duties as assigned to support project and organizational objectives.
  • Other duties as assigned

Qualifications

  • Bachelor’s degree in engineering or related field, diploma in engineering technology, or equivalent industry
  • Bachelor’s degree in engineering or related field, engineering technology diploma, or equivalent industry experience.
  • Minimum 5 years of combined experience in project management, construction management, supervision, or engineering roles.
  • Professional Engineering designation (P.Eng.) or eligibility in Saskatchewan or Alberta is an asset.
  • Project Management Professional (PMP) certification preferred.
  • Red Seal certification in a construction‑related trade is an asset.
  • Experience in mining, mineral processing, or heavy industrial projects is a strong asset.
  • Proficiency with project management software and digital project tools.
  • Knowledge of project management frameworks, construction methodologies, and best practices.
  • Strong organizational skills with the ability to manage multiple priorities and maintain execution discipline
  • Effective communication and presentation skills for both client‑facing and internal interactions.
  • Strong analytical and problem‑solving abilities, including the use of data intelligence to evaluate project performance.
  • Demonstrated conflict resolution skills and the ability to navigate complex stakeholder environments.

We look forward to receiving your cover letter and resume. We thank all applicants who apply; however only those selected for an interview will be contacted.

Compensation:Commensurate with education and experience.

Benefits: March offers a comprehensive benefits program which includes Life, Disability, Health and Dental as well as competitive retirement benefits (RRSP), a health spending account, paid sick time and more!

Work hours: 40 hours per week, Monday – Friday.

Work location: Saskatoon, Regina, or Calgary. We will consider remote work options for out-of-province candidates.

Emplois semblables

  • Construction Scheduler

    Toronto, ON
    Sur placeTemps plein

    Clearway

    5+ ansCandidates need a university or college degree in engineering or construction technology, 5+ years in construction and 3+ years in scheduling. They must be proficient in Primavera P6, Microsoft Project and Excel, and have the right to work in Canada.

    Primavera P6, Microsoft Project, Excel, Bluebeam Revu, Jonas Construction Software, HeavyBid

  • Construction Scheduler

    Surrey, BC
    110k–150k $/anSur placeTemps plein

    Industra Construction Corp

    10+ ansCandidates need at least 10 years of construction scheduling experience, including maintaining schedules for several active projects at the same time. Strong knowledge of critical-path scheduling and proficiency in Primavera P6 or Microsoft Project are required.

    Primavera P6, Microsoft Project

  • Client Advisor

    Saskatoon, SK
    Temps partiel

    Royal Bank of Canada: Royal Bank of Canada is a global financial institution with a purpose-driven, principles-led approach to delivering leading performance.

    Cotation en bourse: TSX:RY · NYSE:RY · Source vérifiée: 2026-11-02

    Royal Bank of Canada needs candidates with proven success in a hands-on, target-driven sales environment and a clear focus on putting clients first. Strong problem-solving, people skills, digital literacy and availability for all business hours are required.

    smartphones, tablets, laptops

  • Grocery Clerk Part Time Day

    Saskatoon, SK
    Temps partiel

    Loblaw

    Candidates need flexibility to work days, evenings and weekends, the ability to lift up to 50 lbs and stay on their feet for a full shift. No previous experience is required and training is provided.

  • Retail Sales Associate Part Time Marshalls - Preston Crossing

    Saskatoon, SK
    15–17 $/hTemps partiel

    TJX Companies: TJX is the leading off-price apparel and home fashions retailer in the U.S.

    TJX Companies needs friendly, approachable people who communicate clearly and work well in a team. Candidates must be flexible and organized, and they must pass a criminal record check if 18 or older. No prior experience is needed.

    POS

  • Environmental Services Worker

    Saskatoon, SK
    Temps partiel

    HealthCareersInSask.ca

    Candidates need Grade 10 education, basic computer skills and the ability to work independently. A valid driver's licence is needed where required, and a criminal record check with a vulnerable sector search dated within six months is required for interview.

    Business Partner - SHA-Provincial-Transformation Mgmt Off DIR

    Saskatoon, SK
    Temps plein

    HealthCareersInSask.ca

    3+ ansCandidates need 3 to 5 years of experience leading digital transformation projects and an undergraduate degree or diploma in Information Technology, or an equivalent mix of education and experience. A professional association membership in good standing is required, along with a valid Class 5 driver's licence.

  • Quality Assurance Engineer

    Regina, SK +1
    Sur place

    Government of Saskatchewan

    5+ ansCandidates need at least 5 years of relevant construction, contract, design, or standards experience and must be registered or eligible for registration as a Professional Engineer with APEGS. Licensed engineers need 10 years in roadway construction and standards development, and strong communication and collaboration skills are expected.

Lieux et modes de travail

Lieux

Tout le CanadaTélétravail · Hybride · Sur place · Sur le terrain

Astuce : ajoutez le télétravail pour élargir la recherche.

Exclure des lieux

Mode de travail

Offres de cette entreprise dans les résultats

Voici les offres de cette entreprise chargées dans votre recherche. Elle peut avoir d’autres postes ouverts.