Publié il y a 10 mois
Operations Technician Process
@ Pacific Energy Canada
Squamish, Colombie-Britannique
En bref
Woodfibre LNG, a subsidiary of Pacific Energy Corporation, is hiring an Operations Technician Process for its liquefied natural gas export facility near Squamish, BC. The role supports operations readiness, start-up and ongoing plant operations on shift, reporting to the Shift Supervisor. The posting states an hourly rate of CAD $50.47 to $63.86.
Salaire :
50,47 $–63,86 $ de l’heure
Responsabilités :
- Develop operating procedures and core documentation for the LNG facility
- Ensure safe plant operations and equipment availability during shift
- Support implementation of the maintenance strategy and permit to work system
- Deliver accurate daily shift reports to the Shift Supervisor
- Interface with Technical Services and HSSE departments
Résumé des exigences :
- Minimum 5 years in oil and gas production facilities, LNG preferred
- Feed gas pre-treatment and amine solvent experience required
- 4th Class Power Engineering Diploma as a minimum
- Previous experience as an operations technician or process operator
- Fully versed in managing permit to work systems
Outils et compétences
Source et dates
Site carrière / système de candidatures · workable
- Date publiée par l’employeur
- 2025-12-30
- Première détection par notre source
- 2026-10-09
- Mise à jour du dossier source
- 2026-10-15
Ces dates décrivent le dossier source, pas une vérification en direct du recrutement. Consultez l’offre originale.
Détails du poste
| Niveau | Intermédiaire |
| Domaine | Fabrication et production |
| Expérience | 5 an(s) et plus |
| Heures par semaine | 40 (estimé) |
| Horaire | jour, soir, nuit |
| Déplacements | avion : aucun · route : aucun |
| Milieu de travail | Usine, Bureau |
| Position | Assis et debout |
| Exigences physiques | physique modéré · ordinateur modéré |
| Langues | English |
| Permis et certifications | 4th Class Power Engineering Diploma |
| Permis de conduire | exigé |
| Vérifications | drogues et alcool |
Résumé et détails rédigés par l’IA à partir de l’offre; l’offre de l’employeur fait foi.
Pacific Energy Canada
Profil d’entreprise sauvegardé
Renseignements historiques provenant d’un profil The Jobs API sauvegardé (champs LinkedIn/Crunchbase). Ils ne sont pas vérifiés en temps réel; les chiffres peuvent avoir changé. Les valeurs manquantes restent inconnues.
Woodfibre LNG is the first LNG export facility in the world to commit to achieving net zero emissions by 2027.
Description complète de l’entreprise
The Woodfibre LNG Project is operated by Woodfibre Management Ltd, a privately held Canadian company based in Vancouver, British Columbia. The Woodfibre LNG facility is being built on the site of the former Woodfibre pulp mill site, which is located about seven kilometers southwest of Squamish, B.C. on the traditional and unceded territory of the Sḵwx̱wú7mesh Úxwumixw (Squamish Nation). Woodfibre LNG is the first LNG export facility in the world to commit to achieving net zero emissions by 2027. During construction, Woodfibre LNG expects a peak workforce of more than 800 individuals, with over 100 long-term operating positions at the facility once construction is complete. If you are interested in a career at Woodfibre LNG, please visit woodfibrelng.ca/careers
- Abonnés LinkedIn
- 75 190
- Personnes associées sur LinkedIn
- 177
- Bureaux déclarés
- Vancouver, BC, CA
- PO Box 2060, Squamish, British Columbia V8B 0B4, CA
- Catégories d’activité
- Oil and Gas
- Environmental Engineering
- Energy
- Hydroelectric
- Autres noms enregistrés
- Pacific Energy Canada
- Woodfibre Management Ltd
- Woodfibre LNG
- Le profil indique une agence de recrutement
- Non
- Investissement total déclaré
- 0
La devise et la date d’observation ne sont pas fournies; ce n’est ni une valorisation actuelle ni une ronde de financement.
The Woodfibre LNG Project is operated by Woodfibre Management Ltd, a privately held Canadian company based in Vancouver, British Columbia. The Woodfibre LNG facility is being built on the site of the former Woodfibre pulp mill site, which is located about seven kilometers southwest of Squamish, B.C. on the traditional and unceded territory of the Sḵwx̱wú7mesh Úxwumixw (Squamish Nation). Woodfibre LNG is the first…
| Champ | Valeur |
|---|---|
| Secteur | Oil and Gas |
| Taille | 51-200 employees |
| Siège social | Vancouver, BC |
| Type d’organisation | Privately Held |
| Fondée en | 2013 |
| Offres sur Jobsy | 32 |
| Voir la page |
Project
The Woodfibre LNG Project is located approximately 7 km west-southwest of Squamish, British Columbia. It involves the construction and operation of a liquefied natural gas (LNG) export facility on the previous Woodfibre pulp mill site, which would have a storage capacity of 250,000 m3 and would produce approximately 2.1 million tons per year of LNG.
Woodfibre Management Ltd. is a privately held Canadian company based in Vancouver and a subsidiary of Pacific Energy Corporation Limited.
Position
The Operations Technician Process is an integral part of Woodfibre LNG’s dynamic Operations team. The successful candidate reports directly to the Shift Supervisor. This role will be based on the Project Site, in Squamish, BC., and you will play an essential part in supporting the company’s Operations team through the Operations Readiness and Assurance planning and execution and into the Start-Up and Operational Phase of the project. During Operational Phase as Operations Technician Process on shift you will also be a key contributor that the environmental practices and social responsibilities to the community are held to the uppermost standards as set out by Woodfibre LNG.
Key Responsibilities:
The successful applicant will:
- ORA (Operations Readiness and Assurance) Core Team member. Development of Operating Procedures, manuals and core documentation required to operate the LNG Facility efficiently and safely.
- Support the Operations Management in executing the ORA Plan to ensure readiness for Start-Up into the Operational Phase of the project and throughout the life cycle of the facility.
- Key Team member during the Start-Up Phase of the Project.
- Ensure safe production and execution of activities/tasks in the plant operational area during their shift.
- Ensure availability / reliability of plant and equipment during their shift.
- Support Implementation of the agreed Maintenance Strategy.
- Support PTW including functionality/improvements, LOTO isolations standards, competencies, risk assessments, compliance, auditing, PTW manuals and procedures.
- Ensure all equipment and plant to be handed over for maintenance is correctly isolated and in a safe state for personnel to undertake tasks.
- Competencies and Training requirements are in place and measured.
- Develop and implementation of check lists & routines for plant and equipment.
- Timely delivery of input data and correctness for plant daily shift report to Shift Supervisor.
- Interface with the Technical Services Department for integrity issues and compliance checks.
- Interface with HSSE department for compliance and improvements.
- Interface with other departments for support requirements and documentation.
HSSE
- 100% compliance with company HSE policies and guidelines.
- Champion HSE as a member of the LNG Operations Team.
- Attend all Shift Meetings/ safety walks /audits when required.
- Timely intervention to mitigate risks and ensure safety of personnel and plant.
- Demonstrate a personal commitment to influence overall safety behavior in the plant.
- Safeguarding systems checks lists are implemented/completed by Shift Operations to agreed frequencies and standards.
- Ensure that Shift Operations Emergency Response capabilities are 100% met during shift period.
- Basic Fire Fighting and Emergency Response experience preferred.
Requirements
Required Experience:
- Minimum 5 years in Oil & Gas Production Facilities. LNG Experienced applicants will take precedence.
- Experience in Feed Gas Pre-treatment required. Amine Solvent: Acid Gas Removal Units/Mole-sieve Dehydration.
- Heavy Removals, Condensate Stabilization and LNG Liquefaction Cold End Process Experience will have preference.
- 4th Class Power Engineering Diploma as a minimum.
- Previous experience as an Operations Technician Process (Process Operator).
- Previous experience during project phase leading into Start-Up and Operations.
- Previous experience working with other departments to support production targets.
- Fully versed in Managing Permit to Work Systems.
- Are willing to comply with WLNG's drug-free and harassment-free work environment and comply with all safety policies and procedures.
- Undergo a pre-placement medical assessment of your fitness for duty, and Pre-Site Access testing for alcohol and specified drugs.
Additional Requirements:
- Communication/interpersonal skills – to be able to interact effectively with all departments and contractors
- Ability to work well under pressure handling tasks, targets and changing priorities within tight time frames.
- Expertise with a variety of computer programs (e.g. MS Office).
- A valid driver’s license (with abstract) and passport.
- Must be legally entitled to work in Canada.
- The position is based in Squamish, BC (Project Site), with an initial stay period at the Vancouver Office.
Only qualified candidates legally entitled to work in Canada will be contacted.
Thank you in advance for your interest!
Woodfibre Management Ltd. is an equal opportunity employer.
Woodfibre LNG reserves the right to amend the job description, including the title, duties, and qualification from time to time in its sole discretion.
Benefits
Hourly Rate: CAD $50.47 - $63.86/hr
Journal
Visible seulement par vous. Conservé sur cet appareil, et dans votre compte une fois connecté.