Postuler

Publié le mois dernier

Construction Scheduler

@ Industra Construction Corp

Surrey, Colombie-Britannique

110k–150k $/anSur placeTemps plein10+ ans d’expérience
Postuler
SIGNAUX

En bref

Industra Construction Corp is hiring a Construction Scheduler to build and maintain schedules for many concurrent construction projects across Canada. The role covers tender and handover schedules, critical-path forecasting, look-ahead planning and leadership reporting. Full-time, onsite in Surrey, BC, with a stated salary of $110,000 to $150,000 annually.

Salaire :

110 000 $–150 000 $ par année

Responsabilités :

  • Develop, baseline and maintain schedules for concurrent construction projects
  • Prepare tender schedules with Estimating and Pre-Construction
  • Track critical paths and forecast completion dates
  • Develop look-ahead schedules for site teams
  • Report milestones and schedule conflicts to leadership

Résumé des exigences :

  • At least 10 years of construction scheduling experience
  • Experience maintaining schedules for multiple active projects concurrently
  • Proficiency in Primavera P6 and/or Microsoft Project
  • Strong knowledge of sequencing, critical-path scheduling and forecasting

Outils et compétences

Avantages mentionnés

Assurance maladieSoins dentairesSoins de la vueAssurance vieRégime de retraiteCongés payés
Source et dates

Site carrière / système de candidatures · bamboohr

Date publiée par l’employeur
2026-09-28
Première détection par notre source
2026-10-08
Mise à jour du dossier source
2026-10-16

Ces dates décrivent le dossier source, pas une vérification en direct du recrutement. Consultez l’offre originale.

Détails du poste

NiveauSenior
DomaineOpérations
Expérience10 an(s) et plus
Heures par semaine40 (estimé)
Milieu de travailBureau
PositionSurtout assis
Exigences physiquesphysique faible · ordinateur élevé
LanguesEnglish
Avantages mentionnésCongés payés généreux, Régime de retraite, Prime de rendement, Aide au transport en commun

Résumé et détails rédigés par l’IA à partir de l’offre; l’offre de l’employeur fait foi.

Industra Construction Corp

Profil d’entreprise sauvegardé

Renseignements historiques provenant d’un profil The Jobs API sauvegardé (champs LinkedIn/Crunchbase). Ils ne sont pas vérifiés en temps réel; les chiffres peuvent avoir changé. Les valeurs manquantes restent inconnues.

A multi-disciplined, self-perform General Contractor specializing in complex, remote and challenging projects.

Description complète de l’entreprise

Industra Construction Corp. (formerly Bryco Projects Inc.) was founded in 2011 by brothers Scot and Rob Brydon in Kelowna, British Columbia. With extensive experience in municipal infrastructure and industrial construction, the Brydon brothers set out to pursue their passion for complex and challenging projects, often with logistical challenges. Industra is recognized for superior quality and customer service. With over 30 years of construction expertise behind us, the founders, managers and professional staff at Industra bring an unparalleled level of expertise and know-how to every project. We provide E.P.C./design+build and construction solutions to a broad spectrum of industrial, First Nations, municipal, and institutional markets. We are a multi-discipline, self-perform builder who has successfully completed complex, remote and challenging projects throughout Western and Northern Canada. We specialize in the following market sectors. • EPC/Design- Build • Industrial • Water & Wastewater • Remote Arctic • Institutional • Indigenous Affairs • Environmental

Abonnés LinkedIn
12 728
Personnes associées sur LinkedIn
100
Bureaux déclarés
  • 17665 66A Ave, Suite 501, Surrey, British Columbia V3S2A7, CA
  • 754A Fairview Road, Victoria, British Columbia V9A 5T9, CA
  • #301 – 4910 50th Street, Yellowknife, Northwest Territories X1A 1R6, CA
Catégories d’activité
  • Construction
  • Industrial
  • Civil Engineering
Autres noms enregistrés
  • Industra Construction Corp
  • Industra Construction Corporation
Spécialités
  • Municipal / Infrastructure
  • Industrial Construction
  • Institutional Construction
  • Government Contractor
  • Demolition
  • Hazardous Waste Abatement
  • EPC/Design-Build
  • Environmental
  • and Waster and Wastewater
Le profil indique une agence de recrutement
Non
Investissement total déclaré
0

La devise et la date d’observation ne sont pas fournies; ce n’est ni une valorisation actuelle ni une ronde de financement.

Industra Construction Corp. (formerly Bryco Projects Inc.) was founded in 2011 by brothers Scot and Rob Brydon in Kelowna, British Columbia. With extensive experience in municipal infrastructure and industrial construction, the Brydon brothers set out to pursue their passion for complex and challenging projects, often with logistical challenges. Industra is recognized for superior quality and customer service. With…

ChampValeur
SecteurConstruction
Taille201-500 employees
Siège socialSurrey, British Columbia
Type d’organisationPrivately Held
Fondée en2011
SpécialitésMunicipal / InfrastructureIndustrial ConstructionInstitutional ConstructionGovernment ContractorDemolitionHazardous Waste AbatementEPC/Design-BuildEnvironmentaland Waster and Wastewater
Offres sur Jobsy18
LinkedInVoir la page
Description

Surrey, BC | Full-Time | Onsite
Salary: $110,000–$150,000 annually

Industra Construction Corp. is looking for a Construction Scheduler who has managed schedules for multiple active construction projects at the same time. We typically have 15–20 or more projects underway across Canada, and this new role will help our teams plan individual jobs while giving leadership a clear view of milestones, resource demands and schedule risks across the portfolio.

You will work with Estimating, Pre-Construction, Procurement, Project Managers and Superintendents from tender through project completion. You will build practical schedules, keep them current using input from the field, and help teams identify conflicts early enough to act.

This is an opportunity to establish scheduling practices that will grow with Industra. We need someone who is comfortable both working in the detail of a project schedule and bringing several project schedules together to support decisions across the business.

What you'll do

  • Develop, baseline and maintain construction schedules for multiple projects running concurrently.
  • Work with Estimating and Pre-Construction to prepare tender schedules, including sequencing, durations, milestones and key assumptions.
  • Support handover to Operations so schedule commitments, procurement needs and risks are understood before work begins.
  • Work directly with Project Managers and Superintendents to confirm construction sequences, site progress, upcoming work and changes to the plan.
  • Integrate long-lead materials, equipment, subcontractors and other procurement requirements into project schedules.
  • Track critical paths, forecast completion dates and identify delays, resource constraints and opportunities for recovery.
  • Develop look-ahead schedules that help site teams plan labour, equipment, subcontractors and upcoming activities.
  • Provide leadership with a clear view of milestones and potential conflicts between projects, including demands on shared resources.
  • Lead regular schedule reviews and produce concise, useful reporting for project teams and leadership.
  • Help establish consistent scheduling tools, reporting and practices across Industra.

What you bring

  • At least 10 years of relevant construction scheduling experience
  • Demonstrated experience personally maintaining schedules for multiple active construction projects concurrently. This is essential for the role.
  • Strong knowledge of construction sequencing, critical-path scheduling, progress measurement, forecasting and schedule analysis.
  • Proficiency with Primavera P6 and/or Microsoft Project.
  • The ability to work closely with field and project teams to build schedules that reflect how the work will actually be delivered.
  • A practical understanding of how labour, equipment, procurement, subcontractors and logistics affect project timelines.
  • Clear communication skills and the ability to turn detailed schedule information into useful decisions for project teams and leadership.

Experience with heavy civil, industrial, infrastructure, water or wastewater construction is an asset. Experience with remote, northern or logistically challenging projects is also valuable. Relevant post-secondary education is an asset; equivalent experience will be considered.

Why join Industra?

Industra is a growing, multi-disciplined general contractor delivering complex construction projects across Canada. As our first dedicated scheduler in this role, you will have the opportunity to shape how we plan and monitor work across the company and make a visible impact on project delivery.

Benefits are available from day one and include dental, extended health and vision care, disability and life insurance,

RRSP matching, paid time off, onsite parking and bonus eligibility.

Location: Surrey, British Columbia
Department: Project Management
Employment type: Full-Time
Expected salary range: $110,000–$150,000 annually, based on relevant experience, skills and qualifications.

#LI-Onsite

Emplois semblables

  • Construction Scheduler

    Saskatoon, SK
    Contrat

    March Consulting LP

    5+ ansCandidates need a bachelor's degree in engineering or a related field, an engineering technology diploma, or equivalent experience, plus at least 5 years in project, construction management, supervision or engineering roles. Strong project management software skills, organization, and communication and conflict resolution abilities are required.

    Project management software, Project management tools

  • Construction Scheduler

    Toronto, ON
    Sur placeTemps plein

    Clearway

    5+ ansCandidates need a university or college degree in engineering or construction technology, 5+ years in construction and 3+ years in scheduling. They must be proficient in Primavera P6, Microsoft Project and Excel, and have the right to work in Canada.

    Primavera P6, Microsoft Project, Excel, Bluebeam Revu, Jonas Construction Software, HeavyBid

  • Beauty Manager, Hourly Part Time Flexible Shifts

    Surrey, BC
    Temps partiel

    Shoppers Drug Mart

    Candidates need prior sales experience with a proven record of meeting targets, cosmetics experience, and experience leading a team. Excellent written and verbal communication and a strong customer service focus are also required.

    Relation client éLECTRONIQUE application, PC Optimum

    Beauty Specialist, Hourly Part Time Flexible Shifts

    Surrey, BC
    Temps partiel

    Shoppers Drug Mart

    Candidates need proven sales experience, good knowledge of beauty products and services, and strong communication skills. They must be able to lift up to 50 lb, climb a ladder, and bend and stretch to stock shelves.

  • Aide pédagogique spécialisé·e (26.00 hrs/sem)

    Surrey, BC
    34,05 $/h

    Conseil scolaire francophone de la Colombie-Britannique

    1+ ansCandidates need a British Columbia specialized educational assistant certificate or diploma, or a related field, or equivalent education and experience, plus at least one year of related experience. French fluency in speaking and writing is required, with English as an asset and first aid training as an asset.

  • Beauty Manager, Hourly Part Time Flexible Shifts

    Surrey, BC
    Temps partiel

    SDM Surrey 56 (Seehra Pharmacy Ltd)

    Candidates need a proven record of meeting sales goals, cosmetics experience, prior team leadership, and strong verbal and written communication. Customer-service orientation, independent decision making and planning skills are also required.

    Sales Tracking Tools, Dashboard, eClienteling, PC Optimum, CSI survey

    Beauty Specialist, Hourly Part Time Flexible Shifts

    Surrey, BC
    Temps partiel

    SDM Surrey 56 (Seehra Pharmacy Ltd)

    Candidates need proven selling experience, strong communication and consultation skills, and good knowledge of beauty products and services. Lifting up to 50 pounds, climbing ladders and bending to stock shelves are required.

    eClienteling, POS

  • Field and Laboratory Technician (20261106101)

    Surrey, BC
    27,50–30 $/hTemps plein

    Thurber Engineering Ltd.

    Candidates need a high school diploma, a valid Class 5 driver's licence and fluent English. They must lift 50 lbs, work outdoors in all weather and work a flexible schedule, with strong communication and computer skills.

    Quality control, Perform laboratory tests, Work independently, Health and safety in the workplace, Class 5 licence, Communication skills

Lieux et modes de travail

Lieux

Tout le CanadaTélétravail · Hybride · Sur place · Sur le terrain

Astuce : ajoutez le télétravail pour élargir la recherche.

Exclure des lieux

Mode de travail

Offres de cette entreprise dans les résultats

Voici les offres de cette entreprise chargées dans votre recherche. Elle peut avoir d’autres postes ouverts.