Postuler

Publié il y a 6 mois

Construction Scheduler

@ Clearway

Toronto, Ontario

Sur placeTemps plein5+ ans d’expérience
Postuler
SIGNAUX

En bref

Clearway, a Canadian heavy civil contractor, is hiring a Construction Scheduler to build and maintain CPM schedules for construction projects at its Maple, ON head office. The role covers schedule development, revisions, progress reporting and Time Impact Analyses, working with estimating, project management and site teams. Full-time, 8:00 am to 5:00 pm, with a competitive salary of $65,000 to $115,000 and a full benefits package. Work authorization in Canada is required; no sponsorship is offered.

Responsabilités :

  • Create, maintain and update CPM construction schedules in Primavera P6
  • Track progress, delays and schedule changes
  • Prepare progress reports, S-curves and cash flow forecasts
  • Prepare Time Impact Analyses for extension-of-time and delay claims
  • Coordinate with estimating, project management and site teams

Résumé des exigences :

  • University or college degree in engineering or construction technology
  • 5+ years construction experience, 3+ years scheduling
  • Proficient in Primavera P6, Microsoft Project and Excel
  • Knowledge of Earned Value Management (EVM)
  • Legally eligible to work in Canada

Outils et compétences

Avantages mentionnés

Soins dentairesSoins de la vueAssurance vieAssurance invaliditéRégime de retraiteProgramme d’aideCongés payésCongé parentalMieux-être
Source et dates

Site carrière / système de candidatures · bamboohr

Date publiée par l’employeur
2026-05-04
Première détection par notre source
2026-10-08
Mise à jour du dossier source
2026-10-09

Ces dates décrivent le dossier source, pas une vérification en direct du recrutement. Consultez l’offre originale.

Détails du poste

NiveauIntermédiaire
DomaineGestion de projet
Expérience5 an(s) et plus
Heures par semaine40
Horairejour
Déplacementsavion : aucun · route : minimes
Milieu de travailBureau
PositionSurtout assis
Exigences physiquesphysique faible · ordinateur élevé
LanguesEnglish
FormationBaccalauréat (préféré), Collégial (DEC) (exigé)
Domaines d’étudesCivil Engineering, Construction Engineering Technology
Avantages mentionnésCongés payés généreux, Congé parental généreux, Régime de retraite, Prime de rendement, Mieux-être, Aide au transport en commun

Résumé et détails rédigés par l’IA à partir de l’offre; l’offre de l’employeur fait foi.

Clearway

Profil d’entreprise sauvegardé

Renseignements historiques provenant d’un profil The Jobs API sauvegardé (champs LinkedIn/Crunchbase). Ils ne sont pas vérifiés en temps réel; les chiffres peuvent avoir changé. Les valeurs manquantes restent inconnues.

Abonnés LinkedIn
47
Personnes associées sur LinkedIn
5
Bureaux déclarés
  • 59 Glossop St, Allenton, Derby, DE24 8DW, gb
Autres noms enregistrés
  • Clearway
Le profil indique une agence de recrutement
Non
ChampValeur
SecteurUtilities
Siège socialDerby
Offres sur Jobsy28
LinkedInVoir la page
Description

At Clearway we are committed to every project. We pride ourselves on a keen work ethic and more importantly, the talent and skill of our people. In fact, the Clearway Staff is the reason why so many organizations turn to us for the most complex construction assignments. That is how we’ve evolved from a sewer and watermain contractor, to one of Canada’s most reputable construction companies with as many capabilities as there are needs.

Clearway has been operating for more than 50 years, specializing in sewers and watermains, transportation, dry utilities, shoring, road reconstruction, bridges, concrete forming, marine, environmental remediation and treatment plants / pumping stations.

If you are looking to work for a growing company who values the contribution of its employees and you demonstrate creativity, ingenuity, initiative and a high-level commitment then we are the company for you. We offer challenging and rewarding career opportunities, with room to grow, learn and excel.

Summary:

A Construction Scheduler at Clearway is responsible for the creation, maintenance and updating of CPM schedules of construction projects. Tasks involve developing schedules, revisions of schedules, time keeping, document control, coordination with project team, and creating progress reports of the project. The role entails working closely with our Estimating and Proposals Teams, Project Coordinators, Project Managers and all business and technical teams within the company to meet organizational objectives.

The Construction Scheduler will report directly to the Construction Schedule Supervisor.

Location: Clearway's Head Office – Maple, ON.

Hours of Operations: 8:00 am to 5:00 pm

As a heavy civil contractor, Clearway’s workforce requirements can fluctuate with project schedules and anticipated contract awards. We are currently seeking skilled candidates to join our team and encourage qualified applicants to submit their application.

Essential Duties & Responsibilities:

  • Identify major milestones, critical approvals, and long-lead procurement items.
  • Participate in the planning and schedule preparation process during pursuits and in response to RFP documents for projects.
  • Develop and maintain construction project schedules using Primavera P6 software.
  • Follow up with Site Personnel and Senior Management to verify details of proposed project schedules.
  • Revise schedule logic, sequencing, and durations based on resource availability, material supply, site conditions, and other project conditions, as needed.
  • Review vendors’ and subcontractors’ schedule submittals and incorporate them into the construction project schedule.
  • Conduct regular meetings with Site Personnel, including but not limited to the Site Superintendent, Project Coordinator, Project Manager, and Senior Management, to review completed work and confirm upcoming work.
  • Ensure deadlines are met and major project milestones are outlined within schedules.
  • Improve scheduling efficiencies.
  • Prepare and maintain the project schedule log on a regular basis.
  • Promptly notify representatives of perceived changes in the contract conditions and/or the proposed scope of work.
  • Work with the project team to identify errors and brainstorm strategies to avoid potential delays and to accelerate the completion of the work.
  • Develop and maintain strong customer-focused relationships with all stakeholders.
  • Help track delays on progress schedules and develop Time Impact Analyses (TIAs) in a timely contractual manner for extension-of-time requests and delay claims.
  • Complete additional administrative tasks as required by Senior Management.
  • Determine reasonable schedule logic and constraints based on discussions with technical and business teams.
  • Develop realistic activity durations based on production rates and available manpower, in discussion with technical and business teams.
  • Assign resources (cost, labour, equipment, and materials) to activities and develop cash flow reports and resource histograms.
  • Develop schedule narratives and progress reports in line with specified contract requirements.
  • Evaluate critical and near-critical path activity sequences.
  • Assess actual progress based on site inspections.
  • Identify schedule changes and trends.
  • Prepare and maintain project controls and schedule performance reports, including S-curves, cash flow forecasts, earned value analysis, milestone trend analysis, variance analysis, and progress dashboards.
  • Develop and issue regular reports to communicate schedule status, forecast completion, critical and near-critical path activities, schedule deviations, and recommended corrective actions.
  • Analyze planned versus actual progress, productivity, and performance trends to support management reporting, recovery planning, and project decision-making.
  • Suggest corrective actions and/or develop recovery plans when delays are anticipated or occur.
  • Support risk allocation and value engineering workshops.
  • Prepare post-construction as-built schedules and lessons learned reports.

Requirements:

  • University or College education – B. Eng. or Construction Engineering Technology program.
  • 5+ years of experience in construction-related activities.
  • 3+ years of experience in scheduling-related activities.
  • Proficient experience in Primavera P6, Microsoft Project and report preparation.
  • Strong to expert-level proficiency in Excel.
  • Knowledge and use of Microsoft Office Suite and Adobe; Bluebeam Revu is an asset.
  • Knowledge of Jonas Construction Software and HeavyBid estimating programs is an asset.
  • Knowledge of Earned Value Management (EVM).
  • Experience in LRT, railway, transit, MTO, and typical linear civil construction projects is an asset.
  • Excellent communication, organization, time-management, and leadership skills.
  • Strong planning and organizational skills with the ability to multitask and prioritize.
  • Ability to problem-solve.
  • Ability to meet deadlines and work under strict time constraints.
  • Ability to work effectively in a team.
  • Ability to quickly earn the trust of peers, project teams, and key stakeholders to mobilize and motivate teams.
  • Willingness and ability to learn new technology quickly and adapt.
  • Self-motivated and driven.
  • Must be legally eligible to work in Canada – no work permit sponsorship is available for this position.

Benefits:

  • Competitive Salary with annual cost of living increases
  • Annual Bonus Program
  • Group RRSP with 100% Matching
  • 100% Company Paid Benefits
  • Extended Health Care
  • Dental Care
  • Vision Care
  • Disability Insurance
  • Vacation & Personal Days, plus Paid Holiday Shutdown
  • Parental Leave Top-up Program
  • Employee Assistance Program (EAP)
  • Life Insurance
  • Wellness Programs
  • Free On-site Parking
  • Casual Dress

Salary Range: $65,000 - $115,000 (CAD)

The posted salary range is intended to provide transparency and may vary based on experience, skills, and qualifications.

AODA:

Clearway is committed to maintaining an accessible and inclusive organization. We are committed to providing barrier-free and accessible employment practices in compliance with the Accessibility for Ontarians with Disabilities Act (AODA). Disability-related accommodation during the application process is available upon request.

Emplois semblables

  • Construction Scheduler

    Saskatoon, SK
    Contrat

    March Consulting LP

    5+ ansCandidates need a bachelor's degree in engineering or a related field, an engineering technology diploma, or equivalent experience, plus at least 5 years in project, construction management, supervision or engineering roles. Strong project management software skills, organization, and communication and conflict resolution abilities are required.

    Project management software, Project management tools

  • Construction Scheduler

    Surrey, BC
    110k–150k $/anSur placeTemps plein

    Industra Construction Corp

    10+ ansCandidates need at least 10 years of construction scheduling experience, including maintaining schedules for several active projects at the same time. Strong knowledge of critical-path scheduling and proficiency in Primavera P6 or Microsoft Project are required.

    Primavera P6, Microsoft Project

  • Platform Backend Engineer (Go, Distributed Systems & Event Streaming)

    Toronto, ON

    Kaseya Careers: Kaseya is the leading global provider of AI-powered IT management and cybersecurity software.

    Required Qualifications; Experience building and operating production backend services using Go; Experience designing event-driven or streaming systems using Kafka, Numaflow, Flink, or similar technologies

  • Solution Engineer Manager

    Toronto, ON
    128k–222k $/anSur placeTemps plein

    Microsoft: Every company has a mission.

    6+ ans3+ gestionCandidates need a bachelor's or master's degree in a technical or business field plus years of technical pre-sales or consulting experience, with 3+ years of people management preferred. Microsoft wants strong cloud architecture, migration and Azure knowledge, plus the ability to coach teams and win technical decisions.

    Microsoft Azure, Microsoft Copilot, CRM

  • Clinical Educator (Japanese)

    Toronto, ON
    TélétravailTemps partiel

    Vira Health

    3+ ansCandidates need an active healthcare license, at least 3 years of women's health clinical experience in Japan, and professional Japanese. Telehealth experience and clear communication of complex medical information are also required.

    Video conferencing tools, Virtual health platforms

  • Client Services Specialist

    Toronto, ON
    Temps plein

    Solactive AG

    3+ ansCandidates need 3-5 years of experience in client services, sales or business operations, with CRM experience (ideally Salesforce) and strong Microsoft Excel skills. Strong communication, organisation and stakeholder management abilities are also required, and candidates must be legally authorized to work in Canada.

    Salesforce, Microsoft Excel

  • Senior Content Writer

    Toronto, ON
    Temps plein

    Publicis Groupe Holdings B.V

    5+ ansCandidates need 5+ years in a creative role, a portfolio of brand content, strong and clear writing, and deep knowledge of major social platforms. They should be comfortable presenting ideas to senior agency and client stakeholders.

    Community engagement, Presentation skills, Decision making

  • Proposal Specialist

    Toronto, ON +8
    Temps plein

    Dillon Consulting Limited: Dillon is a proudly Canadian, employee-owned, professional consulting firm with over 1,100 employees specializing in planning, engineering,…

    Candidates need proposal preparation and submission experience and post-secondary education in Business, Marketing, Communications or a related field. Skill with AI-enabled tools and proposal management platforms, strong organization under deadlines, and professional services experience are assets.

    AI-enabled tools, proposal management platforms

Lieux et modes de travail

Lieux

Tout le CanadaTélétravail · Hybride · Sur place · Sur le terrain

Astuce : ajoutez le télétravail pour élargir la recherche.

Exclure des lieux

Mode de travail

Offres de cette entreprise dans les résultats

Voici les offres de cette entreprise chargées dans votre recherche. Elle peut avoir d’autres postes ouverts.