Postuler

Publié il y a 6 jours

Cost Estimator, Data center construction

@ Bell

Regina, Saskatchewan

Postuler
SIGNAUX

En bref

Bell is hiring a Cost Estimator for its AI Fabric data centre program in Toronto, Regina or Montreal, reporting to the Director, Program Controls. The role develops early-stage capital cost estimates, Basis of Estimate documents and contingency recommendations for new data centre projects and sites. The work is hybrid, requiring a minimum of 3 office days per week, and the posting states a competitive salary and benefits.

Responsabilités :

  • Develop early-stage capital cost estimates for data centre projects
  • Prepare Basis of Estimate documents and identify exclusions and contingency
  • Coordinate with engineering, procurement and construction on scope validation
  • Review external consultant and contractor estimates
  • Hand approved estimates over to Cost Control

Résumé des exigences :

  • Experience in capital cost estimating, quantity surveying or project controls
  • Ability to develop high-level estimates from limited information
  • Experience with Basis of Estimate documentation
  • Advanced spreadsheet and financial analysis skills
  • Adequate French required for Quebec positions

Outils et compétences

Avantages mentionnés

Soins dentairesSoins de la vueRabais employé
Source et dates

Site carrière / système de candidatures · successfactors

Date publiée par l’employeur
2026-11-05
Première détection par notre source
2026-10-09
Mise à jour du dossier source
2026-11-11

Ces dates décrivent le dossier source, pas une vérification en direct du recrutement. Consultez l’offre originale.

Détails du poste

NiveauIntermédiaire
DomaineFinance et comptabilité
Heures par semaine40 (estimé)
Milieu de travailBureau
PositionSurtout assis
Exigences physiquesphysique faible · ordinateur élevé
LanguesEnglish, French
Avantages mentionnésHoraire flexible, Rabais employé, Mieux-être

Résumé et détails rédigés par l’IA à partir de l’offre; l’offre de l’employeur fait foi.

ChampValeur
Taille10001+
Siège socialMontreal
Offres sur Jobsy162
Description

Req Id: 433117

Connection is everything. It drives us to innovate, explore, and stay close to what matters to us most. At Bell, we’re building a more connected future through world-class networks, AI-powered solutions, and digital experiences that elevate how people live, work, and play every day.

We believe in empowering people. That’s why we equip our teams with cutting-edge technology, AI tools, and a collaborative environment that supports creativity and growth. Want to be part of a diverse team where your work makes a real impact? If you’re inspired by innovation that advances how people connect and transforms what’s possible, you belong on #TeamBell.

On the Bell Business Markets team, you’ll be a vital part of making innovation happen for enterprise-scale customers. You’ll deliver advanced solutions in areas such as IoT, Mobility/5G, Cloud, Cyber Security, Voice, Collaboration & Contact Centre and Internet & Private Networks.

At Bell, your skills and expertise will help set us apart as we continue to be the leading provider of digital connections and next generation services to businesses and governments.

Summary

Bell's AI Fabric program is focused on planning and delivering scalable, mission-critical data centre infrastructure. The Cost Estimator will provide early-stage cost planning and estimating support when potential projects, sites, expansions, or major scope packages are first identified. Working with limited and evolving information, the role will develop high-level capital cost estimates to support opportunity screening, business cases, funding decisions, portfolio planning, and executive decision-making.

Reporting to the Director, Program Controls, the role will establish estimate assumptions, document the Basis of Estimate, identify major cost drivers and exclusions, recommend appropriate contingency, progressively refine estimates as scope matures, and independently review external estimates.

Key Responsibilities

Early-Stage Project Estimating
• Develop conceptual, order-of-magnitude, Class D, and Class C estimates for newly identified projects, sites, expansions, and major infrastructure packages.
• Translate preliminary business, capacity, technical, site, and schedule requirements into an initial capital cost range.
• Prepare estimates using parametric models, historical benchmarks, unit rates, allowances, and comparable project data.
• Update estimates at project-development gates as scope, design, schedule, procurement strategy, and market information mature.
• Compare alternative sites, capacities, phasing plans, technical solutions, and delivery strategies.
Basis of Estimate & Scope Definition
• Prepare Basis of Estimate documents covering scope, methodology, assumptions, inclusions, exclusions, qualifications, escalation, contingency, and estimate accuracy.
• Coordinate with Engineering, Land Development, Procurement, Construction, Operations, Finance, and Project Delivery to validate inputs and scope boundaries.
• Develop cost breakdown structures aligned with the program WBS and cost-control framework.
• Identify scope gaps, interfaces, owner-furnished equipment, enabling works, temporary works, utility requirements, and operational-readiness costs.
Cost Planning, Benchmarking & Risk
• Maintain cost models, historical data, unit rates, benchmarks, escalation assumptions, and estimating templates.
• Normalize costs across sites, capacities, locations, delivery models, and estimate dates.
• Identify uncertainty, cost risks, opportunities, and major cost drivers.
• Recommend contingency appropriate to scope and design maturity.
• Perform sensitivity and scenario analysis for capacity, phasing, schedule, escalation, site conditions, equipment strategy, and utility scope.
Market Intelligence & Estimate Validation
• Coordinate budget quotations for major equipment, construction packages, professional services, and long-lead items.
• Monitor relevant labour, material, equipment, logistics, and construction-market trends.
• Review consultant, contractor, designer, and vendor estimates for completeness, consistency, and reasonableness.
• Reconcile estimate versions and explain changes in scope, quantities, rates, escalation, contingency, and exclusions.
Business Cases, Governance & Reporting
• Provide cost inputs for business cases, capital plans, funding requests, and executive decision materials.
• Prepare concise estimate summaries showing cost range, assumptions, exclusions, contingency, risks, and principal cost drivers.
• Present recommendations to the Director, Program Controls, project leaders, Finance, and executive stakeholders.
• Support the Director, Program Controls in launching and implementing estimating processes, standards, templates, tools, and governance routines.
• Maintain an estimate register showing status, maturity, version, approval basis, and next update.

Estimate Handover to Cost Control
• Provide the approved estimate, Basis of Estimate, cost breakdown, assumptions, exclusions, escalation, contingency, risk allowances, and reconciliation history.
• Map the estimate into approved cost codes, control accounts, and reporting structures with Cost Control.
• Support initial budget baselining and clarify estimate assumptions during execution planning.
• Use actual costs and variances from Cost Control to improve future benchmarks and estimates.

Critical Qualifications

  • Experience in capital cost estimating, cost planning, quantity surveying, project controls, commercial management, construction management, or a related discipline.
  • Ability to develop credible high-level estimates from limited and evolving information.
  • Understanding of conceptual, Class D, Class C, and progressively detailed estimating methodologies.
  • Experience preparing Basis of Estimate documentation and identifying assumptions, exclusions, allowances, escalation, contingency, and cost risk.
  • Strong analytical and financial skills, including advanced spreadsheet modelling and cost analysis.
  • Ability to review external estimates, challenge assumptions constructively, and communicate with executives.

Preferred Qualifications

  • Experience supporting data centre, mission-critical, telecommunications, industrial, energy, or large infrastructure projects.
  • Familiarity with data centre site development, design, procurement, construction, commissioning, operational readiness, and handover.
  • Knowledge of electrical, mechanical, cooling, utility, building-shell, white-space, network, and security infrastructure.
  • Experience with estimating software, cost databases, Power BI, Primavera P6, SAP, EcoSys, or similar tools.
  • Professional designation or certification such as CCP, CEP, PQS, RICS, PMP, or equivalent.

Adequate knowledge of French is required for positions in Quebec.

Additional Information:

Position Type: Management

Job Status: Regular - Full Time

Job Location: Canada : Saskatchewan : Regina || Canada : Ontario : Toronto || Canada : Quebec : Montreal
Work Arrangement: Hybrid
Application Deadline: 11/25/2026

For work arrangements that are ‘Hybrid’, successful candidates must be based in Canada and report to a set Bell office for a minimum of 3 days a week. Recognizing the importance of work-life balance, Bell offers flexibility in work hours based on the business needs.

Please apply directly online to be considered for this role. Applications through email will not be accepted.

We know that caring for our team members is at the heart of a healthy, positive and thriving workplace. As part of our team, you’ll enjoy a comprehensive compensation package that includes a competitive salary and a wide range of benefits to support the well-being of you and your family. As soon as you join us, you'll be eligible for medical, dental, vision and mental health benefits that you can tailor to your specific needs. Plus, as a Bell team member, you'll enjoy a 35% discount on our services and access exclusive offers from our partners.

At Bell, we are proud of our focus on fostering an inclusive and accessible workplace where all team members feel valued, respected, supported, and that they belong.

Bell is committed to clarity in our hiring process. All roles posted are opportunities we’re actively recruiting for, unless stated otherwise. We also want to make sure that everyone has an equal opportunity to join our team. We encourage individuals who may require accommodations during the hiring process to let us know. For a confidential inquiry, email your recruiter or [email protected] to make arrangements. If you have questions or feedback regarding accessibility at Bell, we invite you to complete the Accessibility feedback form or visit our Accessibility page for other ways to contact us.

Artificial intelligence may be used to assess parts of your application. Please review our privacy policy (see Phenom for details) to learn more about how we collect, use, and disclose your personal information.

Created: Canada, SK, Regina

Bell, one of Canada's Top 100 Employers.

Emplois semblables

  • Cost Estimator

    Oldcastle, ON
    65k $/anTemps plein

    Omega Tool Corp

    3+ ansCandidates need a secondary school diploma or college diploma in a related field, 3 to 5 years of cost analysis and data analytics experience, and basic knowledge of mold design and making. Strong computer skills, blueprint and 3D data reading, and attention to detail are also required.

    Microsoft Office, Visual viewing software

  • Senior Cost Estimator - Electrical

    Canada
    Temps plein

    Arcadis

    10+ ansArcadis needs candidates with at least 10 years of cost management experience, ideally in data centres, technology or advanced manufacturing. They should have strong electrical estimating, contractor cost validation, executive-level communication and regular travel ability.

    Industry-standard cost and project management tools

    Senior Cost Estimator - Electrical

    Toronto, ON +1
    HybrideTemps plein

    Arcadis

    10+ ansCandidates need a bachelor's degree in quantity surveying, construction management or a related field, plus at least 10 years of cost management experience, ideally in data centres, technology or high-tech manufacturing. Strong analytical, negotiation, stakeholder and executive communication skills are required, along with willingness to travel regularly.

    Industry-standard cost management tools, Project management tools

  • Senior Cost Estimator, Transit & Rail

    Markham, ON +1
    Temps plein

    EXP

    10+ ansCandidates need a bachelor's degree in engineering, construction management, quantity surveying or a related field, plus 10+ years of construction estimating experience. Strong transit, rail or heavy civil experience and advanced Excel skills are required.

    Microsoft Excel, estimating tools

  • Cost Estimator

    Canada
    Temps plein

    Cleveland-Cliffs Tooling and Stamping Canada Holdings Inc.

    5+ ansCandidates need a college or university degree in a technical discipline and at least 5 years in an automotive or stamping environment. Travel to the US is required, and experience with Siemens NX and Excel is expected.

    Siemens NX, Excel

  • Cost Estimator

    Kamloops, BC
    90k–120k $/anSur placeTemps plein

    Simpcw Resources Group

    5+ ansCandidates need a bachelor's degree or technology diploma in engineering, construction management or a related field, and 5+ years of estimating experience in civil or heavy industrial construction. Strong skills in estimating software, cost controls, contract management and risk management are required.

    Estimating software

Lieux et modes de travail

Lieux

Tout le CanadaTélétravail · Hybride · Sur place · Sur le terrain

Astuce : ajoutez le télétravail pour élargir la recherche.

Exclure des lieux

Mode de travail

Offres de cette entreprise dans les résultats

Voici les offres de cette entreprise chargées dans votre recherche. Elle peut avoir d’autres postes ouverts.