BESS Design Project Engineer
Télétravail au CanadaTélétravailTemps plein
Intersect
3+ ansCandidates need a bachelor's in electrical engineering, 3–7 years in energy storage or power generation, and hands-on utility-scale storage or power system design. Knowledge of grid integration, LFP lithium-ion systems, NEC/NFPA/IEEE standards, and PSCAD or ETAP modeling is required.
PSCAD, ETAP