Mould Set Up (Afternoons)
Vaughan, ONMagna Exteriors Inc.
3+ ansCandidates need a high school diploma or technical post-secondary education, plus 3 to 5 years of injection molding experience at set-up or process engineering level. Valid forklift licence, knowledge of press controls and SPC, WHMIS and QS9000, and the ability to lift up to 50 lbs are required.
injection molding machine, forklift, crane, press controls
Mould Set Up (Nights)
Vaughan, ONMagna Exteriors Inc.
3+ ansCandidates need 3 to 5 years of injection moulding experience at the set-up or process engineering level, plus a high school diploma or technical post-secondary education. They must hold or be willing to obtain forklift and crane licences and be able to lift up to 50 lbs and move heavy moulds in tight areas.
injection molding machine, forklift, crane, press controls